Franklin Frontline.

Neighborhood guide · South

Spring Hill.

One city, two counties, two school districts, two tax bills, and a state consent order deciding what gets built next. A village on the Columbia turnpike from 1809, the ground where Hood's army let Schofield walk past in the dark on November 29, 1864, a Saturn plant in 1990, 29,036 people in 2010 and about 63,000 today. This guide is the whole city and the 37174 zip: the Williamson side on Buckner Lane, Duplex Road and June Lake; Main Street and Rippavilla in the middle; the Maury side on Port Royal Road, Saturn Parkway and Kedron; and the acreage on both edges. Which county line your lot is on and what it costs, what $417,000 buys and what $750,000 buys, why the sewer plant is the real zoning map, how full Summit and Independence are and what Battle Creek High changed, what GM's slow year means on a street of 5,000 paychecks, and what 22 minutes to Franklin's square means at 7:30.

Spring Hill, TN 37174 · Williamson & Maury counties City of Spring Hill · City tax on both sides; two school districts Built 1809 to 2026 Updated September 9, 2026

Neighborhood video. Ninety seconds of B-roll: the Saturn Parkway ramp at the plant gate on first shift, Main Street through the old town at 7:40, Rippavilla's lawn and the battlefield markers, the Crossings lot at noon, a framing crew in Wilkerson Place, the splash pad at Fischer Park, Southern Springs' pickleball courts at nine in the morning, and the Christmas parade turning past the Children's Home. No narration.

B-roll in production
$550K
Median sale
1,085 sales in the compiler's 12 months; $715K on the Williamson side, $490K on the Maury side, $190K to $3.25M
$240
Price per sq ft
City median; $270 in Williamson, $220 in Maury; median house 2,440 sq ft, range 816 to 6,318
0.15–0.30 ac
Typical lot
A tenth in the townhouse rows, a quarter to a half in Wades Grove and Harvest Point, one to five on the edges
38%
New construction
412 sales at a $659,484 median; Dream Finders, Ole South, Century, Del Webb, Signature, Richmond American
~90%
Sales with an HOA
$10 to $504 a month: $40 in Wades Grove, $65 to $90 in Harvest Point, $274 to $334 at Southern Springs
22 min
To downtown Franklin
Free-flow, 13.9 miles by U.S. 31; I-65 at exit 53 in 8, Columbia 18, Cool Springs 29, Nashville 45
Good fit for New-construction buyers under $600K GM, Ultium and Mars households Williamson schools at the bottom of the county's price ladder 55-plus buyers I-65 commuters who want a city, not a town

01 · The place

A city built on a county line, growing on a sewer permit it has already used up.

The first settlers came in 1808 and the town was laid out the year after, on the turnpike between Franklin and Columbia, where the springs are. Nathaniel Cheairs built Rippavilla on Main Street in the early 1850s, and Grace Episcopal put up its board-and-batten church down the road in 1878. On November 29, 1864, John Bell Hood's Army of Tennessee stood across the fields east of the pike with Schofield's Union column trapped on it, and let the column march past in the dark to Franklin, where it dug in; the next afternoon cost the Confederacy six generals fourteen miles north. Historians have argued about the night at Spring Hill ever since, and the American Battlefield Trust has bought back more than 195 acres of the ground it happened on. Rippavilla belongs to the city now and is run by the Battle of Franklin Trust, which also runs Carnton and the Carter House.

The modern city starts in 1985, when General Motors picked 2,100 acres of Maury County farmland for Saturn. The plant built cars under that name from 1990 to 2007 and has been GM Spring Hill Manufacturing since; it employs about 5,000 hourly and salaried people, builds the Cadillac Lyriq, Vistiq and XT5, and sits next to the $2.3 billion Ultium Cells battery plant that GM and LG Energy Solution started running in March 2024. The town of 400 people in 1880 counted 29,036 in 2010, 50,005 in 2020, an estimated 59,398 in 2024, and is put above 63,000 now, across 29 square miles and two counties, which the Census Bureau has ranked the fourth-fastest growth in Tennessee. The compiler's last 12 months show 1,085 closed sales at a $550,000 median, 412 of them new.

What limits it is a pipe. The city treats its wastewater at a five-million-gallon-a-day plant that discharges to Richland Creek and then the Duck River, one of the most biodiverse rivers in North America and the same river the city drinks from. Between June 2023 and May 2025 Spring Hill self-reported 29 effluent violations, mostly nitrogen, and on August 5, 2025 the state issued a consent order with a $65,700 penalty and a moratorium on sewer connections for any project without vested rights. The moratorium does not lift until the plant runs clean for twelve straight months. The board suspended development applications by resolution, published the list of projects that already had their taps, and on January 5, 2026 passed Ordinance 25-29 unanimously to ration what capacity is left, meter every allocation, and let applications start again. Everything else in the city's 2026 runs through that order: the $151.7 million budget, the flat $0.739 rate, the 30 percent water and sewer increase, the reservoir land at Stone Creek.

Who moves here

Two different buyers on two sides of one line. On the Williamson side: families who wanted Williamson County Schools and could not clear Franklin's $790,000, taking a Dream Finders house in Wilkerson Place at $752,873, an all-brick 2010s house in Wades Grove at $589,000, or a Signature house in Saddlewalk at June Lake, which sold more units last year than any community in the zip. On the Maury side: the buyer for whom $490,000 is the number, in Brandon Woods or Quail Run Meadows or a Somerset Springs townhouse, and the Del Webb buyer at Southern Springs, 800 houses on 309 acres off Kedron with eight pickleball courts and a lifestyle director, at a $700,000 median. Across both: the plant. Five thousand GM and Ultium paychecks, Mars Petcare up the pike, and, from 2027, Medacta's North American headquarters and 200-plus jobs at the Commerce Center off Jim Warren Parkway.

What it is not

One place. Spring Hill is a single city government sitting on two counties, two school districts, two appraisal cycles, two development taxes, and three electric utilities, and almost every question a buyer asks here has two answers depending on the parcel. It is also not finished: U.S. 31 through the middle is the only continuous north-south street and its widening has no construction date, the plant is under a state order, and the city's own library is being redesigned because the one it has is too small. The Maury side's combined rate is now higher than the Williamson side's. And the big employer is in a slow year: GM ended the XT6, moved the Acadia out, and ran the XT5 and the two Cadillac EVs on one shift from January to May 2026, with about 700 temporary layoffs.

02 · The pockets

Six pockets, one line down the middle, and $225,000 of difference.

The Williamson–Maury line crosses Spring Hill between Duplex Road and Port Royal Road and settles almost everything: Buckner Lane, Duplex Road, Chapmans Retreat, Rippavilla and June Lake come back Williamson; Port Royal Road, Brandon Woods and Kedron Road come back Maury. The county column is the one to read first. The last column is the compiler's trailing 12 months, taken from its subdivision pages rather than its neighborhood roll-up, which counts a longer window.

PocketWhere, and whenWhat you findLast 12 months
June Lake and the Buckner Road end1991–2026 · Williamson · $2.009 · Heritage or Spring Station, Summit or IndependenceThe north tip of the city, inside the 37179 zip and carrying Thompson's Station mailing addresses: June Lake and Saddlewalk, Brixworth, Newport Crossing, Emberly, Mountain View, Cameron Farms, Loopers Landing, off Buckner Road at the I-65 diverging diamondThe address says Thompson's Station and the tax bill says Spring Hill, which is the single most common surprise in this zip. June Lake is a 775-acre master plan around an 11-acre lake with a town centre still being built out, about 2,900 houses at completion, and Signature's Saddlewalk selling faster than anything else in the market; Brixworth's seven phases of 2004-to-2023 houses on a quarter to half an acre with pool, clubhouse and tennis in $110 a quarter; Dream Finders' Emberly and the 1990s and 2000s streets around it at $420,000 to $610,000. The diverging diamond that opened in May 2024 is why this end drives to work faster than the rest of the city.Saddlewalk at June Lake 83, the zip's busiest; Brixworth 12 · $790K · $250 / sq ft; Emberly 41 · $607K; Mountain View 26 · $422K
Buckner Lane and Duplex Road2000–2026 · Williamson · $2.009 · Allendale, Bethesda or Chapman's Retreat; Spring Station; SummitThe Williamson middle, between Main Street and I-65: Wilkerson Place, Wades Grove, Chapmans Retreat, Autumn Ridge and the Arbors, Wyngate Estates, Cherry Grove, August Park, with Fire Station No. 4 at the corner of the two roadsWhere a Williamson County buyer under $800,000 actually ends up. Wilkerson Place, 300 houses and townhouses started by Crescent and finished by Dream Finders from 2021, with a pool, dog park, trails and playground for $50 to $175 a month, at a $752,873 median and up to $1.03 million; Wades Grove, all-brick 2006-to-2018 houses on a sixth to a third of an acre with $40 to $48 a month in dues and no pool, at $589,000; Chapmans Retreat and Wyngate Estates for the resale under $500,000; Richmond American's August Park at the top, in the $700s and above. Buckner Lane is being widened from two lanes to five and finishes in December 2026; Duplex Road already has three lanes, sidewalks and a multi-use path.Wilkerson Place 74 · $752,873 · $430K–$1.03M; Wades Grove 37 · $589,000 · $253 / sq ft; Wyngate Estates 19 under $500K; August Park 17 new
Main Street and the old town1809–2026 · mostly Williamson · $2.009 · by streetU.S. 31 through the middle: Rippavilla, Grace Episcopal, Ferguson Hall and the Tennessee Children's Home, the depot blocks, the battlefield ground east of the pike, and the older subdivisions off it, from Campbell Station and Spring Hill Estates to Belshire and Benevento EastThe four blocks that make the city look like a town, and the road that makes it feel like a corridor. Rippavilla's lawn and tours, the 195 acres of preserved battlefield, the 1878 church, and the Children's Home whose front lawn holds the Christmas tree; then five lanes of chain retail either side. TDOT's project would widen U.S. 31 from Buckner Road to Johnson Parkway to five lanes and has no construction date; Thompson's Station's segment north of the line moved its engineering to 2026. Buy here for the walk to the parade and the history, not for quiet.Resale stock, no single dominant subdivision; the city-wide resale median is $536,000 across 673 sales
Port Royal Road and the Crossings1998–2026 · Maury · $2.108 · Spring Hill or Battle CreekThe Maury side east and south of Main Street: Brandon Woods and its Enclave, Reserve at Port Royal, Quail Run Meadows, Sawgrass, Hardins Landing, Somerset Springs and Westview townhouses, Arbor Valley, Barton Hills, with Fischer Park at Port Royal and the new police headquarters on the same roadThe volume market, and the reason the city's median is $550,000 and not $700,000. Ole South's Brandon Woods from about $425,000 and 1,625 square feet, Century's Barton Hills, New Home Group's Arbor Valley at $500,000 to $600,000, and the townhouse rows at Somerset Springs and Westview under $350,000; Quail Run Meadows led the under-$500,000 tier with 42 sales. Amenities are per subdivision and modest: a pool and a playground, $65 to $125 a month. Fischer Park's 30 acres, splash pad and half-mile trail are the neighbourhood park for all of it.Brandon Woods 54 new (Ole South) and 39 under $500K; Quail Run Meadows 42 under $500K; Barton Hills 38 new; Somerset Springs 23 under $500K; Arbor Valley 20 new
Saturn Parkway, Kedron Road, and the plant1990–2026 · Maury · $2.108 · Spring Hill ES/MS/HS, or Battle CreekSouthwest of Main Street toward I-65 at exit 53: Harvest Point, Southern Springs, Kings Creek and The Cove, Oak Lake Estates, Golf View Estates, Hampton Springs, the TriStar medical park off Kedron, the Spring Hill Commerce Center on Jim Warren Parkway, and GM's 2,100 acresThe employment side. Harvest Point, Celebration and D.R. Horton from 2018 on a tenth to a half acre with a pool, clubhouse, tennis, dog park and trails in $65 to $90 a month, at $547,000 for a house and $400,000 for a townhouse; Del Webb's Southern Springs, about 800 houses on 309 acres off Kedron built 2017 to 2024, a 19,000-square-foot clubhouse, indoor and outdoor pools, eight pickleball and four tennis courts, more than 70 clubs and a full-time lifestyle director, $274 to $334 a month, at a $700,000 median, with at least one resident 55 or older and new construction finished. The freestanding TriStar ER is here, and so is the site of the $250 million, 68-bed hospital it has a certificate of need for.Harvest Point 48 houses · $547,000 and 21 townhouses · $400,000; Southern Springs 49 · $700,000 · $514,900–$927,820
The edges, and outside the line1900s–2026 · both counties · $1.30 or $1.369 with no city rateRutherford Creek Acres, Mahlon Moore Estates, Derryberry Estates, Windward Estates, Sharp Manor and Cedar Brooke, and the unincorporated county on both sides toward Thompson's Station, Columbia, and the Duck RiverOne to five acres and up, wells and septic fields, no city services and no city rate: a Williamson-side lot outside the line pays $1.30 and a Maury-side lot $1.369, against $2.009 and $2.108 inside. The custom tier lives here. Sharp Manor and Cedar Brooke on one- to two-acre homesites are the compiler's million-plus new-construction communities, with dues of $180 to $200 a year rather than a month. This is also where the city's future water comes from: the Stone Creek land it bought in March 2025 is the reservoir site for the Advanced Purification project.69 sales above $1M city-wide, 6.4% of the year; the year's top close $3.25M

Sources: MLS closed sales, trailing 12 months as of the compiler's 2026 refresh, as compiled by nashvillehome.guru for Spring Hill (1,085 sales) and for Wilkerson Place, Wades Grove, Harvest Point, Southern Springs, Brixworth, Emberly and Mountain View; its under-$500,000 and new-construction pages for the tier counts. The compiler publishes three different Spring Hill polygons: a city page (1,085 sales, $550,000 median), a 37174 zip page (1,247 sales, $515,000), and a neighborhood roll-up whose per-community counts run several times the 12-month subdivision figures. Its 37174 page also files Harvest Point and Saddlewalk under the wrong counties. Where they conflict, the city page and the individual subdivision pages are used and the roll-up is not. Jurisdiction from Nominatim reverse-geocoding of OpenStreetMap street points, September 9, 2026: Williamson County for Buckner Lane, Duplex Road, Chapmans Retreat Drive, June Lake Boulevard and Rippavilla Way; Maury County for Port Royal Road, Brandon Woods Drive and Kedron Road. Good enough to choose a road; confirm any one lot on the county's parcel map.

03 · Homes & market

What a house costs, and which county you paid it in.

Spring Hill closed 1,085 sales in the compiler's trailing 12 months at a $550,000 median and a $619,815 average, from a $190,000 townhouse to a $3.25 million place on acreage, about nine in ten with an association. The number that matters is the split: 509 Williamson sales at a $715,000 median against 576 Maury sales at $490,000, a 46 percent gap inside one city. New construction was 412 sales, 38 percent of the year, at $659,484, and the entry market is real: 544 sales in the zip closed under $500,000 at a $417,342 median, nearly three quarters of them on the Maury side. February 2026, the compiler's most recent single-month read, put single-family days on market at 38 against 27 a year earlier, supply at 4.65 months, and 47 percent of sales below asking. What you are buying is Williamson County Schools at the bottom of the county's price ladder, or Maury County's price with a city's services on top.

$550K
Median, city-wide
1,085 sales; average $619,815; $190,000 to $3.25M; built 1900 to 2026; about 90% with an HOA
$715K / $490K
Williamson / Maury
509 sales against 576; averages $719,166 and $532,021; a 46% gap across one county line
38%
New construction
412 sales at a $659,484 median and $671,516 average, against $536,000 for the 673 resales
$417K
Median under $500K
544 sales in the zip: Maury 397 at $415,000, Williamson 147 at $420,000; 31 of them under $300,000
$240
Price per sq ft
City median; $270 in Williamson on 2,600 sq ft, $220 in Maury on 2,250; city median house 2,440 sq ft
38 days
On market
February 2026 single-family, up from 27 a year earlier; 4.65 months of supply; 47% sold below ask
12%
Sales with concessions
144 of the zip's sales, averaging $10,911; $11,400 in Williamson, $10,500 in Maury
69
Sales over $1M
6.4% of the year, with another 130 between $800,000 and $1M; the peak band is $400K to $500K at 29%

Sources: MLS closed sales, trailing 12 months as of the compiler's 2026 refresh, as compiled by nashvillehome.guru in its Spring Hill community guide (1,085 sales, with the county split, the price bands and the new-versus-resale cut), its under-$500,000 page (544 sales) and its 37174 zip page (1,247 sales, with the concession figures and the per-county price per foot). Days on market, months of supply and the below-ask share are from the compiler's February 2026 monthly report, a one-month figure. Middle Tennessee's July 2026 county roll-up put Williamson at 313 closings, a $1,035,000 median and 28 days, and Maury at 203 closings, a $422,100 median and a 125-day list-to-close pipeline; those are whole counties, not this city. Everything refreshes monthly; figures move.

04 · The city, and its rules

A board of nine, two counties, and a consent order that outranks the zoning map.

Spring Hill is a full city, with its own police, fire, water, sewer, sanitation, parks and library, laid across a county line it does not control, running a wastewater plant the state has put under order. What a buyer needs to know about how it works, as of September 2026:

QuestionThe answerWhat it means for you
Who runs itMayor and eight aldermenA mayor elected at large and eight aldermen, two from each of four wards, all elected at large to four-year staggered terms, with municipal elections in April. Mayor Matt Fitterer, who beat the incumbent Jim Hagaman on April 10, 2025; Vice Mayor Trent Linville of Ward 4; Aldermen John Canepari and Alex Jimenez in Ward 1, Jaimee Davis and Scott Wernert in Ward 2, Erinn Hartwell and Brent Murray in Ward 3; City Administrator J. Carter Napier, hired July 7, 2025. The board's voting meeting is the third Monday at 6 and its work session the first Monday at 6, in the courtroom at City Hall, 199 Town Center Parkway; the planning commission meets the second and fourth Mondays at 5:30A nine-member board with wards; the sewer allocations and the rezonings are voted on the third Monday
The county lineWilliamson north, Maury southOne city, two of everything else. The school district, the property tax rate, the reappraisal cycle, the development tax on a new house, the trustee who bills the county share and the sheriff's office all change at the line, which crosses the city between Duplex Road and Port Royal Road. Williamson reappraised in 2025 and charges $1.27 inside its cities; Maury reappraised in 2026 and cut its rate 28 percent to a revenue-neutral $1.369. The city's own $0.7390 is the same on both sides, and the city bills it itselfAsk for the parcel number, not the mailing address; the answer sets your school and your bill
The sewer orderTDEC Consent Order WPC2025-0093The plant treats five million gallons a day, discharges to Richland Creek and the Duck River, and was running around four million when the order landed. Between June 1, 2023 and May 31, 2025 the city self-reported 29 effluent exceedance violations, mostly nitrogen. On August 5, 2025 TDEC issued the consent order with a $65,700 civil penalty, $13,140 of it due in 30 days, and a moratorium on new sewer connections for every project without vested rights under state law; the board accepted it by Resolution 25-183. It lifts only after the plant meets the order's performance standards for twelve consecutive months. The city published the list of vested projects, suspended development applications under Resolutions 25-238, 25-259 and 25-268, and then passed Ordinance 25-29 unanimously on second reading on January 5, 2026, which set a capacity-allocation framework, required a flow meter on every project that gets an allocation, and lifted the application suspension. Applications for the remaining capacity go to the boardA finished house on an existing tap is fine; a lot, a lot split or an addition that needs a new tap is a board decision
The long fixAdvanced Purification, and the Duck RiverSpring Hill draws its drinking water from the Duck River and discharges to it, and the state will not let it send more nitrogen down. The Advanced Purification project would treat wastewater to a high standard, blend it with raw river water in a reservoir, and run the blend back through the water plant, so the same water is used more than once instead of the city asking for a larger withdrawal. TDEC approved the pilot in August 2024, the commissioner toured in February 2025, and the city bought the Stone Creek land in March 2025 as the reservoir site, with state SWIG grant money behind it. In the meantime the 2026 Sewer Rehabilitation Project is chasing inflow and infiltration through the 150-plus miles of collection system into early 2027, and the utility added ten positions and a new engineering divisionThe capacity question is a decade-long project, not a quarter; price the constraint into anything unbuilt
The codeUnified Development Code, 2018; revised November 2025The zoning ordinance and the subdivision regulations were folded into a single Unified Development Code in August 2018, with a user's manual, and the board approved revisions to it in November 2025. The long-range document is Spring Hill Rising: 2040, the comprehensive plan that replaced the 2011 plan's long list of land-use categories with a smaller set of character areas and set the principles the UDC is written against. The major thoroughfare plan sits alongside itOne code for zoning and subdivision; check the character area as well as the zone before you plan anything
What the rate buys$151.7 million, adopted June 2026A fiscal 2027 budget of $151.7 million with the rate held at $0.7390, eleven new positions and three reclassifications, a $27.4 million general-fund opening balance and $36.2 million in the water and sewer fund, and a second consecutive Distinguished Submission from the state comptroller. The recent capital is visible: a 60,000-square-foot police headquarters off Port Royal that opened in May 2025, and Fire Station No. 4 at Buckner Lane and Duplex Road, the Mitchell Earwood Memorial Station, opened November 21, 2025: the city's first two-storey firehouse, its first new station since 2015, ten more firefighters and an expected 25 percent cut in response times on that sideSeventy-four cents buys a real city: police, fire, water, sewer, trash, parks, a library
The roadsU.S. 31, Buckner Lane, Duplex, Port RoyalTDOT's project would widen U.S. 31 to five lanes from Buckner Road to Johnson Parkway, and has no construction date; the segment north of the line in Thompson's Station moved its preliminary engineering to 2026 after that town put in $15 million. The city's own list: Buckner Lane's widening from two lanes to five, whose northern half finished in September 2025 and whose southern half is projected complete in December 2026; the Port Royal Road and Buckner Lane intersection; the Peter Jenkins Greenway Connector; and the Southside Water Tank, with a Countess Road roundabout and further Port Royal Road work pending. Duplex Road was rebuilt years ago as a 3.2-mile three-lane with sidewalks and a multi-use path, and the Buckner Road diverging diamond at I-65 opened in May 2024The city is fixing its cross streets; the state has not started on Main Street
Short-term rentalsMunicipal code, title 20The city code carries a short-term rental chapter, with section 20-501 defining them and 20-504 setting minimum standards, and hosts report permit, inspection and occupancy requirements on top of the usual zoning limits. The code library refused our requests at press time, so we have not read the current text and are not quoting fees or districts from a secondary source. The codes department is the authority, and the association's covenants are usually the tighter of the twoRegulated, with a permit; verify the district and the HOA before you buy for it

In one line

Spring Hill charges seventy-four cents and delivers a whole city, which is the difference between it and Thompson's Station. What it cannot deliver on demand is a sewer tap, and until the plant runs twelve clean months the state, not the board, is the last word on what gets built.

05 · Schools

Two districts, one city, and a line that decides which.

No other guide in this series has this problem. North of the county line the address is Williamson County Schools, with five elementaries, two middles and Summit High serving the city, and Independence taking the far north end; south of it the address is Maury County Public Schools, with Spring Hill's own elementary, middle and high school and the Battle Creek campuses that opened in 2024. Williamson publishes projected enrollment, building capacity and open-zoning seats for every school; for 2026-27 Summit sits at 76 percent and Independence at 96, and Spring Station Middle is the tightest of the local schools at 88. Maury publishes an out-of-zone enrollment process but no comparable capacity sheet. Both districts' zone finders are the only authority for a specific lot.

SchoolGradesNeighborhoodsNotes
Allendale ElementarySpring Hill · Williamson County SchoolsK–5The Williamson middle, including the edges of Wades Grove522 projected for 2026-27 against 890 seats, 59 percent, the emptiest elementary in the cluster with 168 open-zoning spots
Longview ElementarySpring Hill · WCSEC, K–5The Williamson side west and north of Main Street630 against 890, 65 percent, 110 open spots; carries one of the district's early-childhood programmes
Chapman's Retreat ElementarySpring Hill · WCSPK, K–5Chapmans Retreat and the Duplex Road subdivisions521 against 790, 66 percent, 119 open spots; one of the two local elementaries with a pre-K class
Bethesda Elementary4907 Bethesda Road · WCSK–5Wades Grove and Wilkerson Place, per the compiler's subdivision pages630 against 760, 83 percent, 30 open spots; a 2024-25 Reward School, with a $6 million renovation on the district's plan for fall 2029. The drive is east, not north
Heritage Elementary, and Heritage Middle4801 and 4803 Columbia Pike · WCSPK–5; 6–8The Buckner Road end and the 37179 streets: Brixworth, Emberly, Mountain View, part of June LakeHeritage Elementary 580 against 760, 76 percent, 30 open spots; Heritage Middle 853 against 1,060, 80 percent, 57 spots. Both campuses are in Thompson's Station, north of the city line
Spring Station MiddleSpring Hill · WCS6–8Wades Grove, Wilkerson Place, Chapmans Retreat and most of the Williamson side757 against 860, 88 percent, 28 open-zoning spots, the tightest of the schools this guide covers, and the one to check before you buy on the Williamson side
Summit High2830 Twin Lakes Drive · WCS9–12Almost all of the Williamson side1,671 projected against 2,200 seats, 76 percent, 529 seats free with 400 reserved for growth and 129 open-zoning spots; a 2024-25 Reward School, U.S. News' 23rd high school in Tennessee, 53 percent AP participation. The most room of any high school in the south of the county
Independence High1776 Declaration Way · WCS9–12Part of the Buckner Road end and the 37179 streets2,120 against 2,200, 96 percent, 40 open-zoning spots; U.S. News' 21st in Tennessee. Heritage Middle eighth-graders who live in the Summit zone get first call on those 40 seats under board policy
Spring Hill Elementary, Middle and HighMaury County Public SchoolsK–5; 6–8; 9–12Harvest Point, Southern Springs, the Kedron and Saturn Parkway side, much of Port Royal RoadSpring Hill High, on Raider Lane with a Columbia mailing address, had 907 students in 2024-25 and ranks in the top half of Tennessee high schools at U.S. News. Marvin Wright Elementary, PK–4, had about 605 students in 2023-24. Maury does not publish projected enrollment against building capacity
Battle Creek Elementary, Middle and High130 Battle Creek Way · MCPSK–4; 5–8; 9–12The old Spring Hill High zone east of U.S. 31 and south of Saturn Parkway, plus part of the Columbia Central zone south of Bear Creek PikeThe county's answer to Spring Hill's growth: the high school opened August 5, 2024 with grades 9 and 10 and 402 students, added a grade a year, and is a full 9–12 for the first time in 2026-27. A new school with a first senior class, which is either the appeal or the objection

Sources: Williamson County Schools' Open Zoned Schools 2026-27 sheet dated January 7, 2026 for projected enrollment, building capacity, fill rate, reserved growth spaces and available open-zoned spots, and its board policy 1.703 for the Heritage-to-Independence priority; the Williamson Herald and Williamson Source on the January 20, 2026 approval and the February 4 to April 15 application window; the state's 2024-25 Reward Schools list and U.S. News for Summit, Independence and Spring Hill High; Wikipedia and Main Street Media for Battle Creek High's opening, enrollment and attendance zone; GreatSchools and the district for Marvin Wright's 2023-24 enrollment; the compiler's subdivision pages for zoning by neighborhood, which we did not verify address by address. Each district's zone finder is the authority for a specific lot.

06 · Getting around

The drive, honestly timed.

Times are from City Hall at 199 Town Center Parkway on a weekday morning between 7 and 8:30. The Buckner Road end subtracts five to eight minutes from everything north and uses the diverging diamond at I-65; the Kedron and Port Royal side adds five and uses the Saturn Parkway. Three ways out: the Saturn Parkway east to I-65 at exit 53, Buckner Road to the diamond, and U.S. 31 north through Thompson's Station. The Census puts the city's mean commute at 30 minutes, about ten percent above the metro's 27.8. Free-flow figures are OSRM's; the ranges add the rush.

I-65 at exit 53, and the Buckner Road diamondSaturn Parkway east; 8 min free-flow, 6.4 miles; the Buckner Road diverging diamond, opened May 2024, is the north end's ramp10–20min
The GM plant, and the Commerce CenterSaturn Parkway; 12 min free-flow, 4.2 miles to the complex; the Spring Hill Commerce Center on Jim Warren Parkway, east of I-65, on the same road12–25min
Downtown FranklinU.S. 31 north through Thompson's Station and Berry Farms; 22 min free-flow, 13.9 miles; Thompson's Station Town Hall 9 min, 5.0 miles30–45min
Cool Springs, and Williamson MedicalI-65 north from exit 53; 29 min free-flow, 22.5 miles to the Galleria; the county hospital on Carothers Parkway 26 min; TriStar's ER on Kedron under 1035–50min
Columbia, and Maury RegionalU.S. 31 south; 18 min free-flow, 11.1 miles to the square; the county seat, the hospital, the courthouse and the deeds office for a Maury-side buyer20–30min
Nashville, Brentwood, and BNAI-65 north; downtown 45 min free-flow, 37.4 miles; Maryland Farms 34; the airport 49 min, 38.1 miles by I-65 and I-44055–80min

Mobility scores

Walkable3/10

Four blocks of old Main Street work, and June Lake is being built to work, with a lake, a greenway and a town centre planned so residents can walk or take a cart to dinner, but the town centre is still under construction. Everything else is a subdivision with sidewalks inside it and a five-lane road outside it.

Bikeable4/10

Duplex Road's rebuild put a multi-use path along 3.2 miles of the city's main cross street, the Harvey Park Greenway adds 1.3 paved miles from Miles Johnson Parkway to Wilkes Lane on a federal grant, and the Peter Jenkins Greenway Connector is on the current project list. U.S. 31 is not for bicycles.

Transit0/10

None. Franklin Transit stops well north of the city line, and the county commuter association's nearest listed park-and-ride is the Kroger lot here. The plant runs shifts; the city runs no bus.

Traffic painMain Street, then the ramp

U.S. 31 is the only continuous street through the city and carries the retail, the schools and the through traffic between Franklin and Columbia; the five-lane widening from Buckner Road to Johnson Parkway has no construction date. After that it is I-65 north from exit 53 with Columbia and Spring Hill on the same ramp, and it does not loosen until Brentwood.

07 · Daily life

Where the week actually happens.

  • The Crossings of Spring HillMore than 85 shops and restaurants at the Saturn Parkway end: Panera, Olive Garden, Cracker Barrel, Moe's and the rest of the national list, with Target and Kohl's anchoring it. It is where the city eats on a Friday, and it is a parking lot, not a street.Drive · 5–12 min
  • U.S. 31 through townThe independents, the Mexican rooms, the barbecue and the breweries are strung along Main Street between Duplex and Kedron rather than gathered anywhere. Nothing here is a walk from a subdivision; everything is a five-minute drive from most of them.Drive · 3–10 min
  • June Lake's town centreThe dining and retail core of the 775-acre master plan, planned around the 11-acre lake and still being built; a credit union, a salon and a daycare were the first approvals at the Buckner Road and Buckner Lane corner. Worth watching, not yet worth choosing a house for.Under construction
  • Thompson's Station, nine minutes northCirca Grill and Company Distilling on Thompson's Station Road West, and Village Pizza and Mojo's Tacos in Tollgate's village centre, the closest thing to a walkable dinner within ten minutes of the north end.Drive · 9–15 min · Guide →
  • Columbia's squareEighteen minutes south on U.S. 31: the real courthouse square, the restaurants that came with its revival, and the county seat's Friday night. Closer than Franklin, and cheaper.Drive · 18–25 min
  • Franklin, and the rooms with musicBerry Farms' restaurants 18 minutes north, Main Street 22, Leiper's Fork's Fox & Locke about 35. We track the shows nightly.Live music tracker →

08 · The year

What the city does together.

All Franklin events →

Spring Hill runs a longer parks-and-recreation calendar than any town in this series, from a splash pad opening and a skate jam to movies in the park, a campout and a trunk-or-treat, but the dates that anchor the year are these. What we could verify:

09 · Trade-offs

The case for, and the case against.

What you gain

  • A whole city, for seventy-four cents. Police with a new 60,000-square-foot headquarters, a fire department with a new station, water, sewer, trash and recycling on one bill, parks with a splash pad, and a library: everything Thompson's Station contracts out or does without, on a city rate of $0.7390.
  • The price. A $550,000 city median against $690,000 in Thompson's Station and about $790,000 in Franklin, and a Maury side at $490,000; 544 sales in the zip closed under $500,000 at a $417,342 median, which no other guide in this series can say.
  • Williamson schools with room in them. Summit High at 76 percent of capacity with 129 open-zoning spots and 400 seats reserved for growth, Allendale at 59 percent, Chapman's Retreat at 66: the least crowded corner of the district, at the bottom of its price ladder.
  • The jobs are here. About 5,000 at GM and Ultium on 2,100 acres, Mars Petcare up the pike, Medacta's North American headquarters and 200-plus jobs coming to the Commerce Center in 2027, and I-65 in eight minutes for everyone else.
  • What is already built. Eighty-five-plus shops and restaurants at the Crossings, a round-the-clock ER with an approved hospital behind it, 30 acres and a splash pad at Fischer Park, an antebellum house and 195 acres of battlefield, and Columbia 18 minutes one way with Franklin 22 the other.

What you give up

  • A single answer to anything. Two counties means two school districts, two tax rates, two reappraisal cycles, two development taxes and two courthouses, and the line runs through the middle of the city. A listing that says "Spring Hill" has told you nothing that matters.
  • The tax bill. $2.009 on the Williamson side and $2.108 on the Maury side, the county's third-highest combined rate and well above Franklin outside its special school district; on the same $550,000 house that is about $833 a year more than Thompson's Station on the Williamson side and about $970 more on the Maury side, and about $600 more than Franklin outside its special school district.
  • The sewer. A state consent order, a moratorium on new connections that cannot lift until the plant runs twelve clean months, capacity handed out project by project by the board, and a 30 percent increase in the water and sewer rate two years running with more to come.
  • The road. U.S. 31 is the only continuous street through the city, it carries the retail and the schools and the traffic between Franklin and Columbia, and its widening has no construction date. There is no bus, and the Census puts the mean commute at 30 minutes.
  • The employer's slow year. GM ended the XT6, moved the Acadia out, and ran the XT5 and the two Cadillac EVs on a single shift from January to May 2026 with about 700 temporary layoffs. The new product allocations and the LFP conversion are 2027 and later.

The verdict

Decide the county first and the subdivision second. If the reason is Williamson County Schools and you cannot clear Franklin's median, Wades Grove or Chapmans Retreat for resale and Wilkerson Place or Saddlewalk at June Lake for new, and you will pay $2.009 for the privilege. If the reason is the number, the Maury side, Brandon Woods or Quail Run Meadows or Harvest Point, is the cheapest new house within half an hour of Cool Springs, with a different district and a rate that has just been reset. If the reason is a clubhouse and pickleball at 55, Southern Springs is the only community in this series built for it. Get the parcel number before the inspection, ask the city in writing whether the lot has a sewer tap or needs an allocation, and read the third-Monday agenda before you close. If you need one school district, one tax bill and a four-lane road, Berry Farms is 18 minutes north at the price of the difference.

10 · Map

Where it sits.

Thirty miles south of Nashville on U.S. 31, between Thompson's Station and Columbia, with I-65 along the east at exits 53 and 46 and the Saturn Parkway connecting them to the city. City Hall and the town centre are west of Main Street; the county line crosses between Duplex Road and Port Royal Road, putting Buckner Lane, June Lake and Chapmans Retreat in Williamson County and Port Royal Road, Kedron Road and the GM complex in Maury. Rippavilla and the battlefield are on Main Street south of the old town.

City Hall at 199 Town Center Parkway; the police headquarters and Fischer Park on Port Royal Road; Fire Station No. 4 at Buckner Lane and Duplex Road; the Crossings at the Saturn Parkway; the library on Kedron Parkway Williamson County Schools north of the line: Allendale, Longview and Chapman's Retreat elementaries, Spring Station Middle, Summit High on Twin Lakes Drive. Maury County Public Schools south of it: Spring Hill's three campuses and Battle Creek on Battle Creek Way Rippavilla and the 1864 battlefield on Main Street; Harvey Park and its greenway on Miles Johnson Parkway; Evans Park and the Bark Park; the wastewater plant and Richland Creek; June Lake's 775 acres at Buckner Road

11 · Questions

What people ask before they move here.

Which county am I buying in, and why does it matter?

It is the first question here, and it changes four things: the school district, the tax bill, the appraisal cycle and the price. The Williamson–Maury line runs through the middle of the city, roughly between Duplex Road and Port Royal Road. North of it, on Buckner Lane, Duplex Road, Chapmans Retreat, June Lake, Wades Grove and Wilkerson Place, the answer is Williamson County: Williamson County Schools, a $2.009 combined rate, and a $715,000 median across 509 sales. South of it, on Port Royal Road, Kedron Road, Brandon Woods, Harvest Point and Southern Springs, it is Maury County: Maury County Public Schools, a $2.108 combined rate after the 2026 reappraisal, and a $490,000 median across 576 sales. Same city hall, same police, same fire, same water bill, same Main Street. The listing's "Spring Hill" tells you none of it. Ask for the parcel number and check it on the county map before you write the offer.

What is the property tax?

The city's rate is $0.7390 per $100 of assessed value on both sides, held flat in the $151.7 million budget the board adopted in June 2026. On top of it, Williamson County charges $1.27 inside its cities, for $2.009 combined; Maury County charges $1.369, the revenue-neutral certified rate the commission adopted in July 2026 after the reappraisal cut it 28 percent from $1.91, for $2.108. Assessment is 25 percent of appraisal. On the city-wide $550,000 median that is about $2,762 a year on the Williamson side and about $2,899 on the Maury side; on each side's own median, about $3,591 in Williamson and about $2,582 in Maury. The same $550,000 house pays about $1,929 in Thompson's Station, about $2,153 inside Franklin outside the special school district, and about $1,788 in the unincorporated county. Two cautions: the Maury rate is now the higher of the two, which is new, and the counties reappraised in different years, so compare actual bills rather than rates. The city bills its own share; the counties bill theirs.

What is the sewer moratorium, and can I still build?

The city treats its wastewater at a five-million-gallon-a-day plant that discharges to Richland Creek and then the Duck River, and between June 1, 2023 and May 31, 2025 it self-reported 29 effluent violations, mostly nitrogen. On August 5, 2025 the state issued Consent Order WPC2025-0093 with a $65,700 civil penalty and a moratorium on new sewer connections for any project without vested rights under Tennessee law; it lifts only after the plant meets the order's standards for twelve consecutive months. The city published the list of vested projects, suspended development applications by resolution, and then on January 5, 2026 passed Ordinance 25-29 unanimously on second reading, which set up a capacity-allocation framework, required a flow meter on every allocation, and lifted the application suspension. In practice: a finished house on an existing tap is unaffected, and so is a lot in a subdivision whose taps are already committed. A lot that needs a new connection needs an allocation the board votes on. The long-term fix is Advanced Purification: treat the wastewater, blend it with raw Duck River water in a reservoir on the Stone Creek land the city bought in March 2025, and run it back through the water plant. That is a decade, not a quarter. Ask the city in writing, not the listing.

Which schools?

Two districts, split by the county line. On the Williamson side, Williamson County Schools: Allendale, Longview and Chapman's Retreat elementaries in the city, Bethesda and Heritage taking parts of it, Spring Station and Heritage middles, Summit High on Twin Lakes Drive, and Independence High for the far north end. For 2026-27 the district projects Summit at 1,671 against 2,200 seats, 76 percent, with 129 open-zoning spots and 400 seats held for growth; Independence at 2,120 against 2,200, 96 percent, with 40 spots that Heritage Middle eighth-graders in the Summit zone get first call on; Spring Station Middle at 88 percent, the tightest local school; and Allendale, Longview and Chapman's Retreat all under 70 percent. On the Maury side, Maury County Public Schools: Spring Hill, Marvin Wright and Battle Creek elementaries, Spring Hill and Battle Creek middles, and either Spring Hill High, which had 907 students in 2024-25, or Battle Creek High, which opened in August 2024 with grades 9 and 10 and reaches a full 9–12 in 2026-27. Battle Creek's zone is the old Spring Hill High zone east of U.S. 31 and south of Saturn Parkway plus part of the Columbia Central zone. Maury publishes an out-of-zone enrollment process but no capacity-and-open-seats sheet, so the two districts cannot be compared on the same numbers.

Is Spring Hill cheaper than Franklin or Thompson's Station?

Cheaper than Franklin, and it depends against Thompson's Station. The city's 1,085 sales in the compiler's trailing 12 months closed at a $550,000 median against about $790,000 for the city of Franklin and $690,000 for Thompson's Station, and 544 sales in the zip closed under $500,000 at a $417,342 median. But the county line splits that in half. The Williamson side's $715,000 median is above Thompson's Station's, and the same house pays about $833 a year more in tax; what the extra buys is a police department, a fire department, trash pickup, a library and a sewer system. The Maury side's $490,000 median is the cheapest new-construction market in this series, and it buys a different school district. New construction ran 412 sales at $659,484, 38 percent of the year, and the builder list is the one Franklin buyers already know: Dream Finders, Ole South, Century Communities, Del Webb, Signature, Richmond American, D.R. Horton.

How is the commute?

Short to the interstate, long to everything north of it. From City Hall it is 8 minutes free-flow to I-65 at exit 53 by the Saturn Parkway, 9 to Thompson's Station, 12 to the GM plant, 18 to Columbia's square, 22 to Franklin's square by U.S. 31, 29 to Cool Springs, 34 to Maryland Farms, 45 to downtown Nashville and 49 to the airport. Add ten to 30 minutes for a weekday morning; the Census puts the city's mean commute at 30 minutes, about ten percent above the metro average. U.S. 31 through the middle of town is the pinch: TDOT's project would widen it to five lanes from Buckner Road to Johnson Parkway and has no construction date, while the city's own Buckner Lane widening to five lanes finishes in December 2026 and Duplex Road is already three lanes with a multi-use path. The Buckner Road diverging diamond at I-65 opened in May 2024 and is the north end's back door. There is no bus.

What is happening at the GM plant?

It is still the largest employer and it is in a slow year. Spring Hill Manufacturing covers about 2,100 acres, employs roughly 5,000 hourly and salaried people, and builds the Cadillac Lyriq, Vistiq and XT5; the Ultium Cells joint venture with LG Energy Solution, a $2.3 billion plant, started cell production in March 2024. GM ended the XT6 in 2025, moved the GMC Acadia out, and ran the XT5 on a single shift from January to May 2026 with about 700 temporary layoffs, cutting Lyriq and Vistiq to one shift over the same months. Against that, GM has committed $275 million across the complex, more than $150 million of it for a future Cadillac combustion product, allocated the next-generation XT5 and the gas Chevrolet Blazer to the plant, and Ultium is converting lines to lower-cost LFP cells with commercial production expected in late 2027. The other 2026 announcement is Medacta, the Swiss orthopaedic implant maker, moving its North American headquarters from Franklin to the Spring Hill Commerce Center off Jim Warren Parkway with $85 million and more than 200 jobs, occupying about July 2027.

How does it compare to Thompson's Station, Berry Farms and Columbia?

Thompson's Station is the same road nine minutes north with the services subtracted: a $690,000 median, all-Williamson schools, the county's lowest municipal rate at $1.403, and no police department, no trash pickup, no library and sewer in eight subdivisions. Spring Hill is the city version of the same market: more house for the money on the Maury side, a full set of services, and a bill about $833 a year higher. Berry Farms is 18 minutes north inside Franklin at Franklin's prices and $1.566, with a town centre that is built and exit 59 at the door. Columbia is 18 minutes south: a real courthouse square, historic houses at a fraction of the price, Maury County Schools, and a longer drive to everything in Williamson. Spring Hill is the one of the four that gives you a choice of county without changing your address.

12 · Compare

If you like Spring Hill, also look at.

All neighborhoods →

Sources & method